Inspect the old conditions
Review attachment, access, grade, structure, stairs, and the demolition route.
Freedom plans full replacements and new decks around older homes, tight access, University City’s current plan-submission process, and staged inspections.
University City homeowners · Complete projects · Permit and staged-inspection planning

Freedom reviews how the old structure meets the home, how demolition and materials reach the yard, where supports and stairs can fit, and what the homeowner needs the new deck to accomplish.
The complete build is priced first. University City homeowners then compare TimberTech, CedarTone, railing, lighting, and finish options without confusing optional appearance with the structural scope submitted for review.
University City’s Planning and Zoning guidance says the residential building-permit application is currently handled by email or in person, with multiple plan copies required for standard submittals.
After issuance, the city requires the permit authorization to remain posted, asks for inspection requests at least 24 hours in advance, and directs work not to continue beyond a required phase until approval. Freedom builds that sequence into the contracted schedule.
Freedom coordinates the required hold points and does not treat the final inspection as the only moment when the city needs to see the project.
Review attachment, access, grade, structure, stairs, and the demolition route.
Document the site, framing, supports, guards, materials, and applicable options.
Move plans through the current city process while finalizing homeowner finish choices.
Coordinate assigned inspections and wait for approval before covering or advancing work.
University City’s current Planning and Zoning guidance says the residential building-permit application is not available as a normal online submission and is handled by email or in person.
The city’s current guidance calls for multiple paper plan sets—commonly four for standard residential review—unless staff confirms a different small-project submittal method.
Yes. The city instructs permit holders to keep the permit or authorization card visible at the property while work is underway.
No. University City directs contractors not to proceed beyond a required inspection phase until the work has been approved. Freedom coordinates those hold points in the project schedule.
Send the address, old-deck condition, and access details. We will review the site and current city process.