Assess the change
Define the new deck or replacement and how it changes the home’s outward appearance.
Freedom plans full decks and replacements around Frontenac permitting, applicable architectural review, property and tree constraints, and finish choices selected without pressure.
Frontenac homeowners · Complete projects · Permit and design-review coordination

Freedom reviews the existing home, proposed footprint, grade, mature landscaping, access, stairs, and the way the deck will be seen from neighboring properties. We identify the likely review path before treating a finish package as final.
The proposal establishes the complete structural work and then separates TimberTech, railing, lighting, and finish upgrades. Frontenac homeowners can choose a premium direction without being forced to purchase every option.
Frontenac’s construction and Architectural Review Board materials distinguish between work that changes outward appearance and certain alterations or repairs that do not. The city notes that existing-deck work without an outward change can be exempt from ARB review, while building-permit requirements still apply.
For a complete new deck or visibly changed replacement, Freedom confirms the applicable city path and organizes the site, structure, exterior materials, trustee notice, and landscape considerations before construction.
Freedom confirms whether building, architectural, landscape, or trustee documentation applies, then ties the contracted work to the approved documents.
Define the new deck or replacement and how it changes the home’s outward appearance.
Review trees, landscaping, drainage, access, grade, easements, and neighboring context.
Coordinate structure and visible materials while keeping upgrades itemized.
Follow required city reviews and carry covered construction through final.
Not necessarily. Frontenac’s published ARB guidance says certain alterations or repairs that do not affect outward appearance, including work on existing decks, can be exempt. A complete new deck or visibly changed replacement should be classified with the city.
No. Architectural review and the building permit are separate. A project can be exempt from ARB review while still requiring construction documents, a permit, and inspections.
Frontenac’s review materials address tree preservation, landscape plans, root protection, and site context for applicable projects. Mature trees can also affect pier locations, access, drainage, and the workable footprint.
Yes. Freedom prices the complete structure first and shows TimberTech decking, railing, lighting, and other finish alternatives separately so homeowners choose the level that fits their priorities.
Send the address, current structure, and design goals. We will review the likely city path, site conditions, and project fit.